Riga Maternity Hospital
Contract –
- dismantling of ventilation equipment and metal structural elements thereof in the basement;
- dismantling of overhead thermal insulation materials;
- metal shaft dismantling;
- dismantling of asbestos overhead linings;
- the accumulation of asbestos waste resulting from the dismantling operations and its disposal at the landfill containing asbestos-containing waste in the “Dumini” Broceni district;
- the accumulation and removal of waste resulting from dismantling operations.
- CLIENT Riga Maternity Hospital
- YEAR 2012
- WE DID Asbestos Disposal
- PARTNERS Ltd. EkoDem / Ltd. LEST
- CATEGORY Asbestos containing elements utilization , Asbestos waste transport , Laboratory services , Pipeline dismantling , Pollution localization , Space purification , Space sealing , Ventilation equipment dismantling
- TAGS Asbestos , Dismantling
Related Projects
LONGVIND, IMO 9547336
REMOVED MATERIALS: gaskets and spare parts The data used is…
Rail Baltica
During the construction works of Rail Baltica Riga Central Station,…
AS Putnu fabrika, Kekava
Object “Demolition of the boiler house building”, at the address…