LONGVIND, IMO 9547336
REMOVED MATERIALS: gaskets and spare parts
The data used is taken from the project plan and from the IHM report (reference: 19.120018, version 1.0)
FINDINGS OF THE VISUAL INSPECTION:
The removal of the asbestos is performed correctly, in accordance with current Latvian standards, laws and regulations.
LIMITATIONS AND / OR EXCLUSIONS FROM THE VISUAL INSPECTION:
The entire Vessel, except for the designated installation components where the removal is carried out.
CONCLUSIE VAN DE VISUELE INSPECTIE:
The working area meets the requirements as set in NEN 2990. The work area is visually approved.
The gaskets and spare parts have been completely removed and double packed.
- YEAR 2021
- WE DID Dismantling and disposal
- CATEGORY Asbestos containing elements utilization , Asbestos waste transport , Pollution localization , Removal of asbestos from the ship , Space purification , Space sealing
- TAGS Asbestos , Dismantling , Ship
Related Projects
Rail Baltica
During the construction works of Rail Baltica Riga Central Station,…
AS Putnu fabrika, Kekava
Object “Demolition of the boiler house building”, at the address…
Latvian Television (LTV)
Dismantling works: Sampling; Cleaning of the object from asbestos-containing materials.