Rail Baltica
During the construction works of Rail Baltica Riga Central Station, the builders have discovered asbestos remnants during the transfer of engineering communications networks. Hazardous material has been collected and taken to a landfill for hazardous waste, subject to all safety precautions. These works required an additional working week.
In the first stage of Rail Baltica Riga Central Unit works, engineering communications will be transferred, a new transformer station will be built, as well as preparations for platforms – reconstruction of signaling, cable and switches, as well as demolition of some underground structures.
- CLIENT PS BERERIX, BESIX Group, RERE Būve
- YEAR 2021
- WE DID Dismantling and disposal
- PARTNERS EkoDem Ltd
- CATEGORY Asbestos containing elements utilization , Asbestos waste transport , Cutting of the pile end , Laboratory services , Pipeline dismantling , Pollution localization , Space purification , Space sealing
- TAGS Asbestos , Debris , Dismantling
Related Projects
LONGVIND, IMO 9547336
REMOVED MATERIALS: gaskets and spare parts The data used is…
AS Putnu fabrika, Kekava
Object “Demolition of the boiler house building”, at the address…
Latvian Television (LTV)
Dismantling works: Sampling; Cleaning of the object from asbestos-containing materials.