Cesis Clinic
Thursday, 01 August 2019
by Miks Lejins
Contract – the dismantling of the ventilation unit and its metal structural elements in the basement 2 rooms (“ventilation unit” and “ventilation chamber”); dismantling of overhead thermal insulation materials; metal shaft dismantling; ventilation equipment dismantling; the accumulation of asbestos waste resulting from the dismantling operations and its disposal at the landfill containing asbestos-containing waste in
Riga East Clinical University Hospital, In-patient Department “Gailezers”
Thursday, 01 August 2019
by Miks Lejins
Contract – dismantling of pipelines and utilization of asbestos-containing cladding elements.
Riga Maternity Hospital
Thursday, 01 August 2019
by Miks Lejins
Contract – dismantling of equipment and metal structural elements together with asbestos fiber containing insulation.
World Trade Center “RIGA”
Thursday, 01 August 2019
by Miks Lejins
Contract – disassembly and removal of ventilation equipment and metal structural elements from the object. The warm air ventilation systems were insulated with asbestos fiber-containing building materials.
Riga Maternity Hospital
Thursday, 01 August 2019
by Miks Lejins
Contract – dismantling of ventilation equipment and metal structural elements thereof in the basement; dismantling of overhead thermal insulation materials; metal shaft dismantling; dismantling of asbestos overhead linings; the accumulation of asbestos waste resulting from the dismantling operations and its disposal at the landfill containing asbestos-containing waste in the “Dumini” Broceni district; the accumulation and